ABS Greenlights Toray’s Innovative Technique for In-Situ FSO, FPSO Repairs

September 17, 2024

ABS Greenlights Toray’s Innovative Technique for In-Situ FSO, FPSO Repairs
(Credit MODEC)

Japan-based Toray Industries has secured type approval from the American Bureau of Shipping (ABS) for the vacuum-assisted resin transfer molding (VaRTM) process for in-situ ship repairs, developed jointly with MODEC.

The technique entails applying carbon fiber reinforced plastic (CFRP) to corroded areas with reduced thicknesses of floating production, storage and offloading (FPSO) and floating storage and offloading (FSO) systems.

ABS is one of the world’s leading classification societies, accounting for around half of FPSO and FSO certifications. This approval enables these certified vessels to employ the proprietary VaRTM process, reducing the time needed for engineering reviews and verifications for ship repairs.

FPSO and FSO maintenance is normally offshore using steel materials. The welding, or hot work, halts oil and gas production.

Toray and MODEC jointly developed the VaRTM repair process in 2020. It entails applying Toray’s TORAYCA carbon fiber woven fabric, which offers excellent strength and elasticity, to the surfaces of existing steel structures. The next step is to cover the fabric with a film, vacuum-seal, and inject epoxy resin that then cures to complete repairs by bonding the CFRP to the steel structures.

In-situ VaRTM process diagram (Credit: Toray Industries)

Another advantage of this in-situ VaRTM process is that it is easier than with regular steel-based techniques to transport materials and equipment to locations and perform repairs faster and with fewer people and time. The procedure does not involve hot work, minimizing impacts on oil and gas production, according to the Japanese company.

Toray said it continue to work on its in-situ VaRTM process for a range of industrial applications while developing repair and reinforcement technologies for FPSOs and FSOs to promptly address market needs.


Valeura Starts Wassana Platform Installation Offshore Thailand

October 9, 2026

Valeura Starts Wassana Platform Installation Offshore Thailand

Shell to Take 30% Stake in Equinor's Bay du Nord Project off Canada

October 9, 2026

Shell to Take 30% Stake in Equinor's Bay du Nord Project off Canada

TenneT Joins Subsea Cable Decommissioning Tool Development

October 8, 2026

TenneT Joins Subsea Cable Decommissioning Tool Development

Legasea Launches Subsea Basket Rental Program

October 8, 2026

Legasea Launches Subsea Basket Rental Program

Tropical Storm Isaias Forces Shell, Chevron to Curb Gulf Production

October 8, 2026

Tropical Storm Isaias Forces Shell, Chevron to Curb Gulf Production

Viking Energy PSV Moves Closer to Ammonia Operations

October 9, 2026

Viking Energy PSV Moves Closer to Ammonia Operations