Aker BP Confirms Gas Discovery in Norwegian Sea

October 3, 2024

Aker BP Confirms Gas Discovery in Norwegian Sea
Deepsea Nordkapp rig (Credit: Odfjell Drilling)

Aker BP has proven gas in an appraisal well in the Norwegian Sea, confirming also the size of previous discoveries made in 2022.

The 6507/2-7 S well, located around 12 kilometers west of the Skarv field, was drilled to confirm the size of the previous discoveries made in 2022 in 6507/2-6 - Storjo East and Kaneljo in Jurassic and Cretaceous reservoir rocks, respectively.

Preliminary estimates place the size of the discoveries between 2 and 8.7 million standard cubic meters (Sm3) of recoverable oil equivalent in the primary exploration target. This corresponds to around 13-55 million barrels of oil equivalent.

In the secondary exploration target, the preliminary estimate is between 1.3-1.8 million Sm3 of recoverable oil equivalent, which corresponds to around 8-12 million barrels of oil equivalent.

Aker BP is the operator of production license 261 with Wintershall Dea (Harbour Energy) as the other licensee.



The licensees will consider tying the discoveries back to existing infrastructure in the area.

The appraisal well was drilled by Odfjell Drilling’s Deepsea Nordkapp rig, which will proceed to production license 932 where Aker BP is the operator.

Saipem Agrees $272M Deal to Acquire Deep Value Driller Drillship

February 17, 2026

Saipem Agrees $272M Deal to Acquire Deep Value Driller Drillship

Equinor Hires Havila Shipping’s PSV

February 16, 2026

Equinor Hires Havila Shipping’s PSV

Aker Solutions Nets Five-Year Deal with Aker BP for Norwegian Assets

February 16, 2026

Aker Solutions Nets Five-Year Deal with Aker BP for Norwegian Assets

Trump Calls Out California, UK Energy Deal

February 16, 2026

Trump Calls Out California, UK Energy Deal

ABL Secures Work at Egypt’s Kamose Gas Field

February 16, 2026

ABL Secures Work at Egypt’s Kamose Gas Field

Mammoet Completes Record Module Loadout at Khalifa Port for Gas Project

February 17, 2026

Mammoet Completes Record Module Loadout at Khalifa Port for Gas Project