Equinor’s Hammerfest LNG Plant on Maintenance Pause until July

April 22, 2025

Equinor’s Hammerfest LNG Plant on Maintenance Pause until July
The Hammerfest LNG plant (Photo: Helge Hansen / Equinor)

Equinor's Hammerfest LNG terminal, Europe's largest liquefied natural gas export facility, has gone offline for annual maintenance as planned, transparency data showed on Tuesday.

The maintenance outage at the Hammerfest plant, also known as Melkoeya LNG, started at 0400 GMT and is scheduled to last until July 10, according to the regulatory filing.

Equinor did not immediately respond to a request for comment.

Melkoeya LNG has the capacity to deliver about 6.5 billion cubic metres of gas per year, enough to supply about 6.5 million European homes, and accounts for roughly 5% of all Norwegian gas exports.

The plant at Melkoeya island receives gas from the Snoehvit field in the Barents Sea, some 143 km (89 miles) offshore. Its owners are Equinor, Petoro, TotalEnergies, Vaar Energi and Harbour Energy.


(Reuters - Reporting by Nora Buli, editing by Terje Solsvik)

Penspen Strengthens North-East Commitment With New Aberdeen Office

May 27, 2025

Penspen Strengthens North-East Commitment With New Aberdeen Office

Simon Møkster Shipping Pools Starlink bandwidth from Marlink

May 27, 2025

Simon Møkster Shipping Pools Starlink bandwidth from Marlink

First Oil from Mero-4 FPSO in Brazil pre-salt

May 27, 2025

First Oil from Mero-4 FPSO in Brazil pre-salt

World Energy: Tariffs Reshape the Future

May 27, 2025

World Energy: Tariffs Reshape the Future

Kuwait, Saudi Arabia Make Oil Discovery in Neutral Zone

May 27, 2025

Kuwait, Saudi Arabia Make Oil Discovery in Neutral Zone

Keyfield Ventures into Indonesia’s Oil and Gas Market with New Partner

May 23, 2025

Keyfield Ventures into Indonesia’s Oil and Gas Market with New Partner