MISC Secures Long-Term Charter for Papua New Guinea's First FSO

February 19, 2026

MISC Secures Long-Term Charter for Papua New Guinea's First FSO
© SimonPeter / Adobe Stock

Malaysia’s MISC has secured long-term bareboat charter and operations and maintenance contracts with ExxonMobil PNG (EMPNG) for Papua New Guinea’s first floating storage and offloading (FSO) unit.

The contracts comprise a firm 15-year charter with extension options of up to an additional 15 years. The FSO will be deployed at the Kumul Marine Terminal as part of the Kutubu Pipeline System and will support storage and offloading of liquid hydrocarbons, including crude oil and condensate, produced from various fields. Associated gas will be fed into the PNG LNG Project.

The PNG LNG Project has a production capacity of more than 8.3 million tonnes per annum. It is operated by EMPNG, which holds a 33.2% participating interest, alongside Santos (39.9%), ENEOS Xplora (4.7%), Kumul Petroleum Holdings (19.4%) and Mineral Resources Development Company Limited (2.8%).

The FSO will have a 30-year operational lifespan and a minimum storage capacity of 800,000 barrels. It is scheduled for deployment in the first half of 2028 and will include capabilities to handle condensate for potential future projects.

“Following our strategic entry into Brunei with the Kelidang FPU project, this venture continues our momentum in pushing boundaries and entering new markets. It demonstrates our commitment to supporting our partners and host nations to responsibly monetise their resources for long-term development. This venture is more than a contract; it is about laying a foundation for the future,” said Zahid Osman, President & Group CEO of MISC.

The project will leverage MISC’s integrated capabilities, including engineering and construction support from Malaysia Marine and Heavy Engineering Holdings Berhad (MHB), as the company expands its offshore portfolio in the region.

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

February 18, 2026

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

Dolphin Drilling, Vantris Ink Marketing Deal for Blackford Dolphin Semi-Sub

February 18, 2026

Dolphin Drilling, Vantris Ink Marketing Deal for Blackford Dolphin Semi-Sub

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

February 17, 2026

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

February 18, 2026

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Exxon’s Uaru, Whiptail Projects Advance Ahead of Schedule in Guyana

February 19, 2026

Exxon’s Uaru, Whiptail Projects Advance Ahead of Schedule in Guyana

Staatsolie: Guyana-Suriname Gas Pipeline of ‘High Interest’

February 19, 2026

Staatsolie: Guyana-Suriname Gas Pipeline of ‘High Interest’