OranjeWind Signs Long-Term CSOV Charter with Purus

June 8, 2026

OranjeWind Signs Long-Term CSOV Charter with Purus
Purus Power CSOV (Credit: Purus)

The OranjeWind offshore wind project, a joint venture between RWE and TotalEnergies, has signed a five-year charter agreement with Purus for the construction and service operation vessel (CSOV) Purus Power.

The vessel will support planned and unplanned maintenance activities at the OranjeWind offshore wind farm under a contract that includes an option for extension.

Purus Power has been purpose-built for offshore wind operations and is designed for extended stays at sea. The vessel features accommodation, office space, meeting rooms, a gym and a canteen for maintenance personnel.

The vessel is equipped with an integrated walk-to-work system that enables technicians to transfer safely between the vessel and wind turbines, along with other equipment intended to support offshore operations.

The 88-meter-long vessel has a beam of 19 meters and is equipped with a diesel-electric and battery-hybrid propulsion system. Purus said the vessel has been designed to enable future upgrades and potential conversion to emission-free energy sources.

OranjeWind is being developed 53 kilometers from the coast of IJmuiden in the Netherlands.

Using 53 15 MW Vestas offshore wind turbines, the wind farm will generate up to 795 MW of green electricity, the equivalent to consumption of more than 1 million Dutch households.

The full commissioning of the OranjeWind offshore wind farm is expected in early 2028.

"By bringing the Purus Power into our operations, we’re strengthening not only our maintenance capability but also our long-term commitment to safe and efficient offshore performance. This partnership with Purus ensures that our technicians have the right tools and environment to keep OranjeWind running reliably for many years to come," said Bart van der Wielen, General Manager O&M of OranjeWind.

Sempra, TotalEnergies Produce First LNG at Mexico’s ECA LNG Project

June 5, 2026

Sempra, TotalEnergies Produce First LNG at Mexico’s ECA LNG Project

Van Oord Wraps Up Cable Installation at Windanker Offshore Wind Farm

June 5, 2026

Van Oord Wraps Up Cable Installation at Windanker Offshore Wind Farm

Ichthys LNG Strike Intensifies as Union Talks with Inpex Collapse

June 8, 2026

Ichthys LNG Strike Intensifies as Union Talks with Inpex Collapse

Equinor’s Hammerfest LNG Pauses Ops for Scheduled Maintenance

June 8, 2026

Equinor’s Hammerfest LNG Pauses Ops for Scheduled Maintenance

Eni Enters Gambia with Offshore Oil and Gas Exploration License

June 5, 2026

Eni Enters Gambia with Offshore Oil and Gas Exploration License

SBM Offshore to Sell 45% Stake in Mexico-Bound FSO to NYK

June 5, 2026

SBM Offshore to Sell 45% Stake in Mexico-Bound FSO to NYK