Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)

Bartolomej Tomic

October 18, 2022

Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)
©Sembcorp Marine

Estaleiro Jurong Aracruz (EJA), a Brazilian subsidiary of Singapore's Sembcorp Marine, has completed the construction of the P-71 FPSO, integrating topsides on the China-built hull.

The new FPSO vessel left the EJA shipyard on Tuesday. It will be deployed at Petrobras' ultra-deepwater Itapu field in Brazil’s Santos Basin. 

When operational, the P-71 will produce up to 150,000 barrels of oil per day (BOPD).The P-71 measures 316m by 54m and can store 1.6 million barrels. The FPSO can accommodate 166 people.

Estaleiro Jurong Aracruz's P-71 work scope included the construction of six modules, pipe-racks, and a flare, and integrating them onto the vessel along with other modules and items supplied by Petrobras. EJA also modified FPSO’s topsides and hull to meet Itapu field requirements.

The hull of the FPSO was built in China by CIMC Raffles and arrived in Brazil in March, 2020.

 


BW Offshore Sells FPSO Umuroa for Scrap

March 14, 2022

BW Offshore Sells FPSO Umuroa for Scrap

November 29, 2023

Saipem Inks $1.9B in Contracts

Commonwealth Wind Moves Forward with Mass. Offshore Wind Deal

November 16, 2022

Commonwealth Wind Moves Forward with Mass. Offshore Wind Deal

Low Interest Shown in US' First Gulf of Mexico Offshore Wind Auction

August 29, 2023

Low Interest Shown in US' First Gulf of Mexico Offshore Wind Auction

How Serious a Problem is the Cost Issue in U.S. Offshore Wind?

September 4, 2023

How Serious a Problem is the Cost Issue in U.S. Offshore Wind?

Energy Transition: What is an Offshore Vessel Operator to Do?

June 20, 2023

Energy Transition: What is an Offshore Vessel Operator to Do?