Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)

Bartolomej Tomic

October 18, 2022

Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)
©Sembcorp Marine

Estaleiro Jurong Aracruz (EJA), a Brazilian subsidiary of Singapore's Sembcorp Marine, has completed the construction of the P-71 FPSO, integrating topsides on the China-built hull.

The new FPSO vessel left the EJA shipyard on Tuesday. It will be deployed at Petrobras' ultra-deepwater Itapu field in Brazil’s Santos Basin. 

When operational, the P-71 will produce up to 150,000 barrels of oil per day (BOPD).The P-71 measures 316m by 54m and can store 1.6 million barrels. The FPSO can accommodate 166 people.

Estaleiro Jurong Aracruz's P-71 work scope included the construction of six modules, pipe-racks, and a flare, and integrating them onto the vessel along with other modules and items supplied by Petrobras. EJA also modified FPSO’s topsides and hull to meet Itapu field requirements.

The hull of the FPSO was built in China by CIMC Raffles and arrived in Brazil in March, 2020.

 


Intelatus Provides Snapshot of U.S. Offshore Wind Industry Progress

July 6, 2022

Intelatus Provides Snapshot of U.S. Offshore Wind Industry Progress

Petrobras Orders 10th FPSO for Búzios Field

October 4, 2022

Petrobras Orders 10th FPSO for Búzios Field

BW Offshore Sells FPSO Umuroa for Scrap

March 14, 2022

BW Offshore Sells FPSO Umuroa for Scrap

Preparing for Floating Wind – Leveraging the Oil & Gas Supply Chain

June 28, 2024

Preparing for Floating Wind – Leveraging the Oil & Gas Supply Chain

US Offshore Wind Segment Showing No Signs of Slowing Down

June 1, 2022

US Offshore Wind Segment Showing No Signs of Slowing Down

Aker Solutions, Drydocks to Upgrade Petrojarl Knarr FPSO for Deployment at Equinor's Rosebank Field

January 9, 2023

Aker Solutions, Drydocks to Upgrade Petrojarl Knarr FPSO for Deployment at Equinor's Rosebank Field