Argeo to Use Uncrewed Vessel for Stromar Offshore Wind Farm Survey

March 20, 2023

Argeo to Use Uncrewed Vessel for Stromar Offshore Wind Farm Survey
©Argeo

Norwegian offshore survey company Argeo has signed a survey contract with Stromar, a consortium of Ørsted, Renantis, and BlueFloat Energy looking to build a floating wind farm offshore Scotland. 

Stromar has awarded Argeo a contract to conduct a geophysical survey in the project’s development area, located in the Moray Firth off the coast of Scotland.

The Stromar offshore wind farm covers an area of 256 km2, and the project aims to reduce greenhouse gas emissions throughout the wind farm's life cycle, including survey activities. 

Argeo will mobilize its low-emission uncrewed surface vessel (USV) “Argeo Argus” to conduct the survey. An uncrewed solution will reduce the survey vessel emissions by up to 95%, Argeo said.

“Stromar is an exciting venture in offshore wind, and I’m very pleased that the consortium chose Argeo for their first commercial survey with an uncrewed surface vessel. This shows that we are developing attractive technology and can offer cost efficient and environmentally friendly solutions to the offshore wind market going forward”, said VP of Sales in Argeo, Ruben Kornmo Janssen.

Stromar Project Director, Nicholas Ritchie, said: “Ensuring Stromar leads the way in floating wind as part of the transition to renewable energy is of paramount importance. We’re determined that every aspect contributes to our Net Zero future, even from survey stage to demonstrate our commitment to a truly green future.”

The survey is scheduled for Q3 2023, subject to the relevant permit approvals, and includes the option for a related export cable route (ECR) survey.

LNG Prices Projected to Spike; European Stocks Dwindle

September 17, 2026

LNG Prices Projected to Spike; European Stocks Dwindle

Oil Goes Down 2% as Saudi Supply Concerns Recede

September 18, 2026

Oil Goes Down 2% as Saudi Supply Concerns Recede

Boskalis’ Windpiper Starts Maiden Job at Polish Wind Farms

September 10, 2026

Boskalis’ Windpiper Starts Maiden Job at Polish Wind Farms

CM Energy to Introduce CM Zenith Offshore Vessel to European Market in 2028

September 4, 2026

CM Energy to Introduce CM Zenith Offshore Vessel to European Market in 2028

Windward Offshore Completes Four-Vessel Vard-Built CSOV Fleet (Video)

September 7, 2026

Windward Offshore Completes Four-Vessel Vard-Built CSOV Fleet (Video)

Saudi Oil Lifeline Shut After Attack as Red Sea Threat Grows

September 14, 2026

Saudi Oil Lifeline Shut After Attack as Red Sea Threat Grows