FEED Contract Awarded for Ulsan Gray Whale 3 Floating Wind Farm in S. Korea

August 17, 2022

FEED Contract Awarded for Ulsan Gray Whale 3 Floating Wind Farm in S. Korea
Credit: Oceloti/AdobeStock

Technip Energies, in consortium with Subsea 7 and Samkang M&T, has been selected by Corio Generation and TotalEnergies to perform a Front-End Engineering Design (FEED) for their Ulsan Gray Whale 3 Offshore Windfarm project, located offshore the East Coast of South Korea. 

The FEED contract covers engineering for floater, mooring, and inter-array cable (IAC) in collaboration with a wind turbine supplier. The design of the floating foundation will include Technip Energies’ in-house floater technology INO15. 

With a capacity of 15 megawatts, INO15 technology is a three columns semi-submersible floater suited for large series production. 

The Gray Whale 3, aiming to develop a 504MW floating offshore wind farm located around 60 to 70 kilometers from Onsan Port in Ulsan, is one of the three offshore wind projects with a total installed capacity of 1.5 gigawatts that Corio Generation and TotalEnergies are promoting off the coast of Ulsan.

Iran Seizes Foreign Tanker Over Alleged Fuel Smuggling

December 26, 2025

Iran Seizes Foreign Tanker Over Alleged Fuel Smuggling

Viridien Kicks Off Multi-Client Reimaging Program off Malaysia

January 7, 2026

Viridien Kicks Off Multi-Client Reimaging Program off Malaysia

Technical Drilling Campaign Difficulties Push Back Benin Field Start Up

December 24, 2025

Technical Drilling Campaign Difficulties Push Back Benin Field Start Up

Equinor Halts Activities on Empire Wind Project After US Stop-Work Order

December 23, 2025

Equinor Halts Activities on Empire Wind Project After US Stop-Work Order

ANP Halts Petrobras Drilling at Foz do Amazonas Basin After Fluid Leak

January 8, 2026

ANP Halts Petrobras Drilling at Foz do Amazonas Basin After Fluid Leak

Vestas Books First South Korean Offshore Wind Order

December 29, 2025

Vestas Books First South Korean Offshore Wind Order