First Oil Starts Flowing from FPSO Atlanta Off Brazil

January 2, 2025

First Oil Starts Flowing from FPSO Atlanta Off Brazil
FPSO Atlanta (Credit: Brava Energia)

Brazilian oil and gas company Brava Energia has started production from the Atlanta floating, production storage, and offloading (FPSO) unit offshore Brazil.

The achievement makes Brava Energia the first independent oil and gas company in the country to develop a deepwater production system from its initial phase, within the expected budget and the deadlines established for drilling the wells, installing the initial equipment and construction of the FPSO.

In late December 2024, the National Agency of Petroleum, Natural Gas and Biofuels (ANP) in Brazil granted Brava Energia the final permit required for the start of production from the unit.

Production at FPSO Atlanta began through wells 6H and 7H, which are currently stabilizing, while the company continues with the connection campaign for the four remaining wells (2H, 3H, 4H and 5H), expected to be completed by the second quarter of 2025.

The FPSO has the capacity to produce up to 50 thousand barrels of oil per day, treat 140 thousand barrels of water per day and store up to 1.6 million barrels of oil.

The FPSO Atlanta replaced the Petrojal I FPSO unit at Alanta field, which had a lower production and storage capacity, which is now undergoing decommissioning operation.


Japan’s First Floating Wind Farm Comes Online

January 5, 2026

Japan’s First Floating Wind Farm Comes Online

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

December 19, 2025

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

DOF Bags Two Deals in Asia-Pacific Region

December 23, 2025

DOF Bags Two Deals in Asia-Pacific Region

FPSO off Brazil Stabilizing Production After Halt

December 30, 2025

FPSO off Brazil Stabilizing Production After Halt

Iran Seizes Foreign Tanker Over Alleged Fuel Smuggling

December 26, 2025

Iran Seizes Foreign Tanker Over Alleged Fuel Smuggling

Borr Drilling Locks In Mexico Extension, New US Contract for Two Jack-Ups

January 6, 2026

Borr Drilling Locks In Mexico Extension, New US Contract for Two Jack-Ups