First Steel Cut in Turkey for Acta Marine's New Offshore Wind Vessel Duo

January 19, 2023

First Steel Cut in Turkey for Acta Marine's New Offshore Wind Vessel Duo
Credit: Ulstein

The steel cutting ceremony of the first of two next-generation Methanol MDO/HVO-powered DP2 Construction Service Operating Vessels for Acta Marine was held on January 18, 2023, at Tersan in Turkey. 

The SX216 design of the vessel has been developed exclusively and in close collaboration with Ulstein Design & Solutions AS.

The steel cutting is the official kick-off for the construction of the Acta Marine CSOVs at the shipyard. 

The 89-meter-long vessels will have motion-compensated crane and a motion-compensated gangway provided by SMST, which will enable safe personnel transfer in significant wave heights up to 3.0 meters. 

The CSOV provides accommodation facilities for up to 135 people. In addition to the Methanol MDO/HVO engines, the vessels will feature a battery power storage system, creating further energy efficiency and CO2 reduction.

These vessels are the first to be contracted to implement Ulstein’s TWIN X-STERN design. 

According to Ulstein, the design has several unique characteristics, but the main distinguishing features of the vessel are the two sterns and main propeller units at each end. 

"The combination of thrusters and symmetrical hull design results in lower energy consumption and reduced motions, and therefore, higher operability and comfort. This concept dramatically improves the manoeuvrability and ability to stay in position. Further, the design allows for reduced noise, increased comfort on board and the potential to save significant amounts of energy in operation," the company said.

Together with the second newbuild CSOV, which will follow three months later, these vessels will be added to the Acta Marine fleet in the second quarter of 2024, and be deployed in the offshore wind market industry.

Eni, TotalEnergies Greenlight Cronos Gas Development off Cyprus

July 28, 2026

Eni, TotalEnergies Greenlight Cronos Gas Development off Cyprus

Odfjell Drilling’s Deepsea Nordkapp Secures Another Year with Aker BP

July 20, 2026

Odfjell Drilling’s Deepsea Nordkapp Secures Another Year with Aker BP

Petrobras Extends Contracts for DOF-TechnipFMC PLSV Duo

July 31, 2026

Petrobras Extends Contracts for DOF-TechnipFMC PLSV Duo

ABS: Demand for Floating Offshore Wind Vessels is Rising

July 27, 2026

ABS: Demand for Floating Offshore Wind Vessels is Rising

North Sea Pilot Produces Green Hydrogen on Operational Offshore Platform

July 24, 2026

North Sea Pilot Produces Green Hydrogen on Operational Offshore Platform

Iran Rejects Omani Plan for Strait of Hormuz Management

July 29, 2026

Iran Rejects Omani Plan for Strait of Hormuz Management