Chevron South N’dola Platform in Angola Delivers First Oil

January 15, 2026

Chevron South N’dola Platform in Angola Delivers First Oil
The South N’dola Platform. © Chevron

Chevron’s South N’dola Platform in Angola delivered first oil in December. The milestone comes just over two years after construction on the platform began. The South N’dola Platform is in Block 0, the abundant offshore reservoir in Angola that is responsible for 12% of the country’s daily energy output.

“Underpinned by the prolific Block 0, safely achieving first oil at South N’dola is the latest example of Chevron’s efforts to maximize production from our existing offshore assets in Angola,” said Brent Gros, president of Chevron Offshore Business.

Taking advantage of spare capacity in existing infrastructure enabled efficient and cost-effective development of the South N’dola field. The new platform uses a field-to-production-facility tieback. The tieback connects to the nearby Mafumeira facility, where the oil and gas the platform produces are processed and then pumped to the terminal for export. This approach helps eliminate the need for separate oil and gas processing equipment at South N’dola.

The South N’dola success marks a new chapter in Chevron’s long history in Angola.

Chevron has been operating in Angola for more than 70 years. Today, the company operates two offshore tracts in Angola, Block 0 and deepwater Block 14, through a wholly owned subsidiary, Cabinda Gulf Oil Co. Ltd.

Through the company, Chevron continues to contribute to the Angolan economy. During its construction phase, South N’dola was expected to create more than 800 local jobs, and now that it is producing, it will deliver oil and gas to local Angolan plants.

Energy Jobs Reflect Adjustment, Uncertainty, Disruptions

January 14, 2026

Energy Jobs Reflect Adjustment, Uncertainty, Disruptions

Chevron South N’dola Platform in Angola Delivers First Oil

January 15, 2026

Chevron South N’dola Platform in Angola Delivers First Oil

EnBW Incurs $1.4b Impairment Charge After Pulling Out of UK Wind Farms

January 15, 2026

EnBW Incurs $1.4b Impairment Charge After Pulling Out of UK Wind Farms

Saudi Aramco and Commonwealth LNG Ink Long-Term Supply Deal

January 15, 2026

Saudi Aramco and Commonwealth LNG Ink Long-Term Supply Deal

Hanwha Enters Pre-Qualification for Offshore Wind Bid in Nova Scotia

January 14, 2026

Hanwha Enters Pre-Qualification for Offshore Wind Bid in Nova Scotia

US Judge Set to Rule on Equinor’s Bid to Restart Offshore Wind Project

January 15, 2026

US Judge Set to Rule on Equinor’s Bid to Restart Offshore Wind Project