Exxon Begins Uaru Production in Guyana

November 16, 2026

Exxon Begins Uaru Production in Guyana
© John Wreford - stock.adobe.com

ExxonMobil said on Monday it had started production at its Uaru project in Guyana's offshore Stabroek block, bringing the South American country's installed oil production capacity to 1.1 million barrels per day.

Uaru is the fifth ExxonMobil-led development project to start production in the Stabroek block. The company is bringing projects using floating production, storage and offloading, or FPSO, vessels online in stages to expand Guyana's output capacity.

Here are more details:

  • The Errea Wittu FPSO vessel has an initial production capacity of 250,000 barrels per day

  • ExxonMobil said the vessel is expected to achieve its initial capacity in the first quarter of 2027

  • Errea Wittu has storage capacity of 2 million barrels and joins the Destiny, Unity, Prosperity and One Guyana FPSOs

  • Last week, the US energy major approved funding for the Longtail project, its eighth planned Stabroek development

  • ExxonMobil Guyana operates the Stabroek block with a 45% interest, while Chevron holds 30% through its 2025 acquisition of Hess, including Hess' Guyana assets

  • CNOOC Petroleum Guyana holds the remaining 25% interest in the Stabroek block

(Reuters)

Apache Faces Fresh Offshore Strikes Across Seven Platforms

November 16, 2026

Apache Faces Fresh Offshore Strikes Across Seven Platforms

Hanwha Power Secures FSRU Conversion Deal with Energos

November 16, 2026

Hanwha Power Secures FSRU Conversion Deal with Energos

Subsea7 Gets Deepwater Tieback Job Offshore US

November 16, 2026

Subsea7 Gets Deepwater Tieback Job Offshore US

Acta Marine Takes Delivery of Final CSOV in Four-Vessel Newbuild Program

November 16, 2026

Acta Marine Takes Delivery of Final CSOV in Four-Vessel Newbuild Program

Exxon Begins Uaru Production in Guyana

November 16, 2026

Exxon Begins Uaru Production in Guyana

Adura Starts Gas Production at $2.8B North Sea Gas Field

November 16, 2026

Adura Starts Gas Production at $2.8B North Sea Gas Field