Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

October 1, 2026

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue
© Pete / Adobe Stock

Malaysia's state energy firm PETRONAS said on Thursday that Trans Thai-Malaysia (Thailand), its joint venture with Thailand's, had temporarily shut the Songkhla Export Pipeline after identifying an issue during a routine inspection.

The Songkhla Export Pipeline is part of the Trans Thailand-Malaysia gas system linking offshore gas production in the Gulf of Thailand with processing and gas markets in Thailand and Malaysia.


(Reuters - Reporting by Roshan Thomas in Bengaluru; Editing by Subhranshu Sahu)

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

October 1, 2026

Thailand-Malaysia Gas Pipeline Temporarily Shut Over Inspection Issue

Vår Energi Completes Acquisition of Pandion Energy’s Assets

September 30, 2026

Vår Energi Completes Acquisition of Pandion Energy’s Assets

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

September 30, 2026

Solstad Maritime Secures APAC Drilling Support Work for AHTS Pair

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

October 1, 2026

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Tullow Oil Loses $196.5M Ghana Tax Arbitration

September 30, 2026

Tullow Oil Loses $196.5M Ghana Tax Arbitration

India to Auction Offshore Mineral Blocks in Andaman Sea

September 30, 2026

India to Auction Offshore Mineral Blocks in Andaman Sea