Aker Solutions Inks 'Sizeable' Service Agreement

June 26, 2026

Aker Solutions Inks 'Sizeable' Service Agreement
Copyright Postmodern Studio/AdobeStock

Aker Solutions signed a 'sizeable. ($50m to $150m by the company's definition)  five-year agreement with Cenovus Energy Inc. for engineering and maintenance services on White Rose field assets.

The White Rose field is located approximately 350 km east of St. John’s, Newfoundland and Labrador, Canada, on the eastern edge of the Jeanne d’Arc Basin.

The scope includes comprehensive engineering, maintenance, and operations support for the new West White Rose platform as well as the SeaRose Floating Production Storage and Offloading (FPSO) vessel.  

Aker Solutions has delivered offshore engineering services to the White Rose field since 2005, including Concrete Gravity Structure (CGS) tow-out and installation, onshore commissioning, and offshore hookup and commissioning for the new West White Rose platform, which is expected to start production in 2026.

Aker Solutions has also been delivering EPCM services to the SeaRose FPSO since 2005 including onshore engineering, procurement, and work preparation for the FSPO’s recent Life Extension Drydock (LED) campaign in 2024.

The work will be led from Aker Solutions’ office in St. John’s, Newfoundland and Labrador, with approximately 120 employees involved onshore and offshore.

The contract will be booked as order intake in the second quarter of 2026 in the Life Cycle segment.

Anchor Handler Construction: What to Expect as Floating Wind Picks Up

August 16, 2023

Anchor Handler Construction: What to Expect as Floating Wind Picks Up

SOV/CSOV Shipbuilding Market: Strong Growth, Volatility in Coming 5 Years

February 10, 2025

SOV/CSOV Shipbuilding Market: Strong Growth, Volatility in Coming 5 Years

Preparing for Floating Wind – Leveraging the Oil & Gas Supply Chain

June 28, 2024

Preparing for Floating Wind – Leveraging the Oil & Gas Supply Chain

Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)

October 18, 2022

Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)

Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs

February 10, 2026

Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs

German Maritime Fleet: Resilient Strength in Turbulent Times

March 11, 2025

German Maritime Fleet: Resilient Strength in Turbulent Times